PROJECT DELIVERY

Construction project delivery, from plan to handover.

Connect the build plan, construction schedule, tasks and project records. See who owns the next step, what it depends on, and where to find the current decision or revision.

See project delivery in Novato

PROJECT WORKFLOW

From plan to accepted work

Illustrative example
  1. 01

    Plan the stages and key dates

    Draft, ready for review

  2. 02

    Assign the work and what done means

    Owner and checks recorded

  3. 03

    Complete the task and attach evidence

    Waiting for reviewer

  4. 04

    Review the work and record the outcome

    Project record updated

A CLEAR FLOW OF WORK

Connect the steps that move a project forward.

  1. 01

    Shape the build plan

    Start with a job-specific draft, then review the stages, tasks, owners, dates and completion criteria with the people delivering the work.

  2. 02

    Sequence the work

    Set task dependencies and key dates, then use the schedule view that helps the team understand timing, sequence and progress.

  3. 03

    Keep decisions with delivery

    Link the drawings, questions, submissions and delivery checks that affect the work, so the project record carries the context forward.

DRAWINGS THAT CARRY THE DECISION

Open the sheet. See the detail. Leave the context behind.

Keep the current revision, markups, measurements and site questions together. When the drawing changes, the project can see what changed and who needs to know.

  • Measure lengths, areas and counts from a scaled sheet
  • Pin a question to the exact place it affects
  • Compare revisions without losing the earlier record
MoveMeasureEditPenPin More
4.8 m
A-301 · Rev B

PLAN AND SEQUENCE CONSTRUCTION WORK

Construction scheduling connected to the work on site.

A construction schedule is useful when people can trace a date back to the tasks and decisions behind it. Novato brings task owners, planned dates, dependencies and key project dates into the same delivery workflow.

TASK MANAGEMENT

Give each construction task a clear owner and finish.

Assign an owner and reviewer, plan the dates, and record the completion criteria that show what done means. A task can depend on other work, making the wait visible instead of leaving the next step implicit.

During delivery, the owner starts the task, records checklist results and evidence, then sends it for review. The reviewer can approve it or return it with a reason, keeping the outcome beside the task.

CONSTRUCTION SCHEDULING

Choose a schedule view for the question at hand.

Use the Gantt view to see dated tasks across time, compare the current forecast with a saved baseline, and identify the forecast finish and critical path. The network (PERT) view shows dependencies as a sequence, with duration estimates and the chance of meeting a key date when those estimates are available.

The schedule also includes Lifecycle, WBS, line-of-balance and Board views. Each works from the project's tasks, so the team can look at delivery in a view that fits its planning question.

PROJECT MILESTONES

Connect key dates to the work they depend on.

Record important project dates as milestones and connect the tasks that lead to them. Where a milestone needs review, assign an eligible reviewer so responsibility for the decision is clear.

Before locking the plan, readiness checks surface missing task owners, dates, completion criteria and milestone reviewers. The team can resolve gaps while the plan is still under review.

TRADE SCOPE OF WORK

Make the package of work clear before a trade starts.

Build a trade scope as ordered work lines, grouped by project stage when useful. Record descriptions, quantities, units, inclusions and exclusions, then set the engagement's pricing and payment terms.

A trade can suggest changes to scope lines for the builder to accept or reject individually. A scope draft can also start from project facts and selected files, but its proposed wording and quantities remain for a person to check and edit.

See how to set up the build plan

DRAWINGS, DECISIONS AND MATERIALS

Keep project records connected to construction delivery.

Project records are easier to act on when they point back to the work they affect. Keep drawing revisions, questions, submissions and delivery outcomes alongside the relevant project tasks.

DRAWING MANAGEMENT

Find the current drawing revision and its history.

Keep drawing sheets in a project register with their sheet number, title, discipline and current revision. Older revisions remain in the sheet's history, where they are marked as superseded rather than mistaken for the current issue.

Add pins to a drawing revision to identify a location, connect it to a task or issue, and give the team a specific place to follow up.

DOCUMENT CONTROL

Review and publish project documents with revision history.

Add a document as a draft, upload a revision and send it to a named reviewer. Once approved, that revision becomes current while earlier revisions and review comments remain available in the document record.

Link a document to tasks that rely on it. When a new revision is published, affected tasks are flagged so their owners know to check the updated information.

REQUESTS FOR INFORMATION

Keep construction questions and answers in the project record.

Send an RFI to a project contact with the question, a due date and relevant links to a task or record. External contacts can reply from the email link without signing in, and the response stays with the RFI for the team to refer to.

CONSTRUCTION SUBMITTALS

Track trade submissions through review and decision.

Manage submissions such as drawings, product data, samples and method statements. Keep files by revision, set a required-by date and reviewer, then record the decision and comment against the submitted revision.

Link a submittal to the task that needs it, so the team can see which planned work depends on an approval and when the submission is due.

DELIVERY COORDINATION

Check material deliveries before releasing held work.

Record expected materials or equipment, their arrival and a delivery docket. A supervisor checks each line as accepted, short, damaged or incorrect; a discrepancy raises an issue and tells the person who ordered.

If the order is set to hold linked tasks, an arrival by itself does not release the work. The tasks remain held until the delivery is accepted, rejected or cancelled, giving the team a recorded check before it proceeds.

COMMON QUESTIONS

Project delivery, clearly explained.

Does the starting plan fit every project automatically?

No. A job-specific template gives the team a draft to review and shape. Confirm the stages, tasks, owners, dates and completion criteria against the actual project.

Can the team compare schedule changes with its original plan?

After the build plan is locked, its saved baseline can be compared with the current forecast. This helps the team see how planned dates have shifted without losing the original reference.

Can someone outside the project team reply to an RFI?

Yes. Send the RFI to an external contact, who can respond using the link in the email without signing in. The question and response remain in the project record.

Can a delivery hold up the work it is needed for?

A delivery can be set to hold linked tasks. Recording that it arrived does not release those tasks, the delivery must be checked and given an outcome first.