LIVE PROJECT RECORD
Roof frames
Work stopped
People told
Next action
CHOOSE A REAL MOMENT
Each walkthrough shows the decision, the next action and the record Novato keeps behind it.
Fall risk over 2 m is not covered yet.
No safe work method statement is linked to this task.
Built for the bottom of an excavation
When the signal drops, what you record saves on the phone: a note on a task, a photo, a report, a diary note or a sign-in. It sends itself when you are back in range and keeps the time you wrote it, so the record is true. Approvals and permits still need a connection.
- Records saved on the phone first, then sent
- The time you wrote it is kept, not the time it arrived
- You see what is waiting to send
Written 9:41 am. Waiting to send.
Written 9:41 am. Sent 10:12 am.
TAKE IT INTO THE WORK
Useful starting points for your next job.
Turn the walkthrough into something your team can use before the next task, review or site conversation.
Before work starts
A practical prompt for the people, hazards, records and emergency arrangements to check first.
Use the checklist PROMPTReview a SWMS
Check that the method statement matches the actual work, hazards, controls and follow-up.
Use the review prompt SAFETY WORKFLOWKeep the record with the work
See how plans, permits, inspections and incidents connect to the tasks and people they affect.
Explore safety and complianceYOUR NEXT JOB, BETTER CONNECTED.
Build it.
Prove it.
See what Novato could bring to your business. Try it with sample data, or talk to us about a project like yours.
Try the live demo